Projects that almost always require a permit
These touch structure, life safety, or utilities, and are permitted in the overwhelming majority of jurisdictions.
- Additions and any increase in conditioned floor area.
- Structural changes — removing or altering load-bearing walls, beams, headers, or foundations.
- New electrical circuits, service upgrades, and panel replacements.
- New or relocated plumbing, and water heater replacement in most areas.
- HVAC equipment replacement or new ductwork.
- Decks above a threshold height, and any deck attached to the structure.
- Detached garages and most habitable accessory structures.
- Finishing a basement into living space.
- Window and door openings that change size, and egress window installation.
- Demolition, and any change of occupancy or use.
Projects that often do not require a permit
These are typically classified as maintenance or cosmetic — but thresholds vary, and a few authorities permit items on this list anyway.
- Painting, wallpaper, and interior finishes.
- Flooring replacement over an existing subfloor.
- Cabinet and countertop replacement with no plumbing or electrical relocation.
- Like-for-like fixture swaps.
- Small sheds under a local area threshold, placed outside setbacks.
- Fences below a height threshold, though many authorities still require a zoning permit.
The four questions that predict a permit requirement
Before you assume a project is exempt, run it through this filter. If the answer to any of them is yes, plan on a permit until the department tells you otherwise.
- Does the work change structure, load paths, or the building envelope?
- Does it add, move, or modify electrical, plumbing, mechanical, or gas?
- Does it change egress, fire separation, or occupancy?
- Does it change the building footprint, height, or its relationship to setbacks and lot coverage?
Zoning approval is a separate question
A project can be exempt from a building permit and still require zoning approval — fences, sheds, driveways, signs, and accessory dwelling units are common examples. Zoning governs where and how large; building code governs how it is built. Confirm both.
How to confirm without guessing
Call or email the building department with a one-paragraph scope of work and the property address, and ask two questions: does this scope require a permit, and does it require zoning approval. Keep the written answer. If you would rather not chase it, Permit Junkie can build a project checklist from your scope and available authority records, and clearly labels anything that still needs confirmation with the department.