Solar Permits
Solar permits ready for plan review and the utility.
Solar PV and battery permits with structural, fire-setback, rapid-shutdown, and interconnection documentation prepared automatically.
Overview
Structural
We confirm rafter spans, attachment spacing, and reinforcement triggers for your roof type.
Fire setbacks
IFC / CFC fire-pathway and setback rules are auto-checked.
Interconnection
We assemble the one-line, AC disconnect, and utility forms together so it's one submission.
Frequently asked questions
- Do I always need a solar permit?
- In most U.S. jurisdictions, yes — any solar work that affects structure, life-safety, or utility connections requires a permit. PermitJunkie checks your local rules against your project scope so you never guess.
- How long does a solar permit take to approve?
- Approval times vary by municipality and project complexity — from 24 hours for a counter permit to 6–12 weeks for plan review. PermitJunkie's Municipality Intelligence shows live processing times for every jurisdiction in our network.
- What documents do I need for a solar permit?
- Typical packets include an application, scope of work, site plan, scaled drawings, and licensed-contractor proof. PermitPal builds your personalized checklist in seconds based on your address and project type.
- Can PermitJunkie submit the solar permit for me?
- Yes. Our Permit Filing Concierge tier handles preparation, final AI review, and submission to your jurisdiction, then tracks status until it's issued.