Mechanical Permits
Mechanical permits with the right calcs attached.
Mechanical permits for HVAC equipment, ductwork, gas piping, and ventilation. Permit Junkie ties Manual J/D/S to your jurisdiction's IMC/UMC edition.
Overview
HVAC change-outs
We surface Manual J/D/S requirements, refrigerant-line-set length checks, and condensate routing for like-for-like and upsized swaps.
Gas piping
Sizing tables, BTU loads, and shutoff-valve locations are pre-checked against the adopted IFGC / UPC.
Ventilation
Kitchen hoods, bathroom exhaust, and dryer venting are all bundled with the right test/balance forms.
Frequently asked questions
- Do I always need a mechanical permit?
- In most U.S. jurisdictions, yes — any mechanical work that affects structure, life-safety, or utility connections requires a permit. Permit Junkie checks your local rules against your project scope so you never guess.
- How long does a mechanical permit take to approve?
- Approval times vary by municipality and project complexity — from 24 hours for a counter permit to 6–12 weeks for plan review. Permit Junkie's Municipality Intelligence shows live processing times for every jurisdiction in our network.